Critical Activities At City Gate Station (CGS)
Critical Activities At City Gate Station (CGS)
1- Pressure reduction skid CGS (active / monitor
combination) with a minimum 50% redundancy
including slam shut valve for over pressure protection and creep relief valves.
2- On line odorization equipment designed to minimize
fugitive emissions during loading, operation and maintenance.
3- Height of the vent shall be minimum 3 meters
above working level
4- Gas detectors shall be installed at critical locations
5- Pressure reduction for DRS (active / monitor
combination) skid with minimum 50% redundancy
including two safety devices at least one of them
shall be a slam shut valve for over pressure
protection and inlet /outlet isolation valves.
6- Pipeline test record and joint radiography and cover in the form of pipe book.
7- HSSE Management System.
8- Emergency Response Plan, Disaster Management
Plan and written emergency procedures. Also,
provide for an Emergency Control Room, manned
round the clock and equipped with effective
communication system and emergency vehicles
fitted with communication facilities, first aid
equipment, fire extinguishers, gas detectors, repair
kits and tools, maps, plans, material safety data
sheets etc. at its disposal.