How to recommend work for HDD machine by mail.
Dear sir,
As per joint site visit at .... place .........address ......as on date................. along with Mr.....name.. company site........& ..... contractor site name.....we observed that the laying of proposed dia ...(20mm......32mm ..63mm...)....Gas pipeline is not possible by open tranch/ mouiling method due to 200 mm thick pcc road.
As the said work to be done on priority due to construction work of (building name).....to avoid any kind of damage of igl gas pipeline.
Hance, In view of the urgency of matter and site conditions it is recommended to lay the dia .....gas pipeline by HDD method.
Regards
Name
Inspection Engineer
Comments